Fiberglass World


Fiberglass World was established as a world wide trading site for information to promote trade in the Fiberglass, Composites and Advanced Materials Industry.
[ Fiberglass Group Forum | Old Fiberglass Boat Recycling Main Menu | Add Listing ]

Composite Sporting and Recreation Products Newsgroup


Exchange

Fiberglass Products
Fiberglass Services
Composite Supply Showcase
Other Information

Add your Listing

Our Services

Pay Per Lead
Basic Membership
Trader Access
Graphic Advertising

Directories

Associations
Publications
Exchanges
Trade

About Us

Privacy Policy
Contact Us

Operated by

EXPIRED LISTING - submitted on 2009-11-14.
Details and prices quoted are no longer current or valid.
Composite Sporting and Recreation Products : WANTED TO BUY

Location: MACEDONIA, 1000 SKOPJE

GRP climbing wall panels 400m2.
METRIC DATA - Urban lot R=2000m2 - Orientation – open from all 4 sides - Basic height: 1. ARTIFICIAL SPORT CLIMBING CLIFF • Field height +0.00m • 1.middle wall/ for speed competition/ +11.00m • 2.left wall/ for weight competition/ +16.00m • 3.right wall/ for weight competition/ +16.00m 2. ARTIFICIAL CLIFF- BOULDER • Field height +0.00m • Boulder cliff +4.80m 3. SUBSIDIARY OBJECT • Field height +0.00m • Ground floor height -1.50m • Corona height +1.20m 4. INSTALLABLE PLATFORMS • Field height +0.00m • Upper height of the fence +3.10m 5. PILLAR FOR INSTALLATION OF A LIGHTING CONDUCTOR • Field height +0.00m • Top of the pillar’s height +21.55m - Floor heights: 1. ARTIFICIAL SPORT CLIMBING CLIFF • 1. middle wall/ for speed competition/ 11.00m • 2. left wall/ for weight competition/ 16.00m • 3. right wall/ for weight competition/ 16.00m 2. ARTIFICIAL CLIFF- BOULDER • Boulder cliff 4.80m 3. SUBSIDIARY OBJECT • Ground floor 2.70m 4. INSTALLABLE PLATFORMS • Field height 0.00m • Upper height of the fence 3.10m 5. PILLAR FOR INSTALLATION OF A LIGHTING CONDUCTOR • Field height 0.00m • Height on the top 21.55m - Basic dimensions 1. ARTIFICIAL SPORT CLIMBING CLIFF • 1. middle wall wideness 6.00m, total area of 66m2 • 2. left wall wideness 5.00m, total area of 95m2 • 3. right wall wideness 5.00m, total area of 90m2 • 4. ceiling foundation 7m h 11m, total area of 54m2 2. ARTIFICIAL CLIFF- BOULDER • Boulder cliff foundation 5m h 2.40m, total area of 58m2 3. SUBSIDIARY OBJECT • Ground floor foundation 7.25m h 12.25m, total area of 88.80m2 4. INSTALLABLE PLATFORMS • Type 1 foundation 9.25m h 4.05m • Type 2 foundation 11.75m h 4.05m 5. PILLAR FOR INSTALLATION OF A LIGHTING CONDUCTOR • Pillar foundation of the pillar 0,5m2 FUNCTION, CONSTRUCTION, SHAPING AND COLOUR CHOICES 1. ARTIFICIAL SPORT CLIMBING CLIFF The basic project should include the construction of an artificial sport climbing cliff with an area of 305m2. The cliff shall be constructed in the 3D system for active configuration, i.e. it shall contain all the necessary elements for this type of sports object: flat board, veil, ceiling, flaring. It shall be constructed in four sections: middle section – for speed competition/ left wall/ right wall/ and ceiling – for weight competition. The artificial cliff, i.e. the surface on which the sports climbers shall climb is made of triangular panel boards 1sm thick, made of six layers of reticular glass-misted foil, polyester resin and quartz sand for board coverage and for natural cliff image and better embrocation. The panels should be tested in accordance with the European standard for sport climbing structures EN 12572:1998 Annex C. Anti-rotating T-form unit matrixes are placed on the back part of the boards, and holders are locked in the front part. The holders are made of polyester and calcium carbonate and are shaped differently, similar to the natural cliff shapes. One to two internal holders/ with larger diameter are placed on every square meter of the panel board and 5 to 6 holes are placed on every square meter on the holders. Starting from the bottom towards the top of the cliff, sport climbing pegs are placed with a carrying capacity of 20 KN, and pegs and chain anchor is placed on the corner. The board appearance, divided by the artificial cliff sectors is as follows: - the cliff’s RIGHT, MIDDLE side and CEILING are made of GRP smooth boards and sections with micro molding GRP boards; - the artificial cliff’s LEFT side is made of GRP triangular panel boards, and 20% of the surface shall be covered with molding GRP triangular panel boards. The artificial cliff consists of bar-shaped steel spatial construction, made by elements that form a type of consolar spatial bar. The construction system consists of steel elements with different diameters: I profiles and closed square profiles. The artificial cliff construction consists of 3 leaning vertical climbing parts reaching +11.00m height, horizontal platform reaching +11.00m height and two vertical climbing parts reaching +16.00m height. 2. ARTIFICIAL SPORT CLIMBING CLIFF– BOULDER Other artificial cliff - type boulder is to be built. This cliff has smaller dimensions, i.e. total area of 58m2. Due to the type of competitions that shall be performed on the boulder cliff, it should be installable, consisting of 5 different cliff profiles and same height of 4.80m. They can be displaced depending on the requirements of the host of the game. This cliff type is to be made of GRP smooth boards and sections with micro-molding GRP boards 1sm thick, made of 6 layers of reticular glass-misted foil, polyester resin and quartz sand for board coverage. The panels should be tested in accordance with the European standard for sport climbing structures EN 12572:1998 Annex C. Anti-rotating T-form unit matrixes are placed on the


Listing ID: LW911111
To view contact information to this listing,
ENTER YOUR EMAIL ADDRESS AND CLICK GO :


Quantity Units Frequency
400 m3 One Time Only
Price Funds Per Unit
45 EURO m3


NOTE : This is an archived listing and the details of the listing are outdated and no longer valid.
ID TYPE ITEMS ( Found : 55 ) DATE
LW1292993 Wanted fiberglass. 2020-12-09 08:42:00
LA1173713 Available Fiberglass Tape & Carbon or Aramid. 2016-10-10 11:34:00
LW1153654 Wanted Motocycle race fairings. 2016-02-15 03:45:00
LW1145404 Wanted fiberglass for limbs archery. 2015-11-07 13:12:00
LA1141756 Available Fiberglass Materials. 2015-10-01 11:13:00
LA1091269 Available Lick Liquid Surf Wax. 2014-05-07 17:25:00
LA1067633 Available Model FG100. 2013-10-08 02:24:00
LA1066007 Available jet skis. 2013-09-22 20:42:00
LW1048197 Wanted Archery Bows. 2013-04-10 06:57:00
LA1045384 Available cheap carbon fiber fabric 200g/m2. 2013-03-16 09:43:00
LA1041490 Available Fiberglass slides. 2013-02-07 23:08:00
LA1038749 Available Stadium seat. 2013-01-10 08:36:00
LW1026342 Wanted S - Glass. 2012-09-07 20:33:00
LA1015243 Available steering wheels for sailing boats . 2012-05-16 09:14:00
LA1011648 Available Fiberglass slide. 2012-04-09 09:16:00
LW990509 Wanted Need Prototype Snow Board Built. 2011-09-09 13:03:00
LW978509 Wanted fiberglass sides of pool needs repair. 2011-05-16 15:21:00
LA962326 Available Glass cloth for Surf Boards. 2010-12-27 01:35:00
LA958024 Available Model Ultra Plus Nano. 2010-11-11 00:46:00
LA950601 Available Waterslide. 2010-09-13 06:30:00
LW922574 Wanted S-Glass. 2010-01-28 18:24:00
LW911111 Wanted GRP climbing wall panels 400m2. 2009-11-14 15:48:00
100110 Forum Luge Sled. 2009-01-22 19:31:00
LA841238 Available field and ice hockey sticks. 2008-09-28 16:41:00
LA816904 Available Race fairing. 2008-05-29 00:50:00
Submit an inquiry/message to the Forum
Composite Sporting and Recreation Products Newsgroup
Join this Forum
Fiberglass World
    Webmaster FeedBack | Vacuum Molding Equipment | NewsGroups | Membership | Privacy Policy | Main Menu    

Olram Montacargas Y Baterias             SAMPE 2024 - LA1361237

Cooksmill.com
| File No:
Cooksmill Netsystems